This application area focuses on establishing a verified baseline of physical conditions at a given point in time. It is applied where design, planning, or works depend on an accurate understanding of what physically exists on an offshore asset, within an operational facility, across a site, or within an existing structure, before assumptions are made.
By verifying physical conditions as they are, Phase provides a defensible factual baseline that supports early risk identification and informed decision-making ahead of commitment.

Existing conditions established before modification, shutdown, or campaign work proceeds.

Physical conditions of existing plant and facilities established before design or construction proceeds.

Ground conditions and buried services established before excavation or intrusive works proceed.

Outputs that record their method, sources and limits, for engineering reviews, regulatory submissions, and approval processes.

Integrated site and subsurface information compiled into a defensible reference used in reviews, approvals, and readiness decisions